NEW KAISER-WILHELM-TUNNEL

https://imm-bochum.de/wp-content/uploads/2024/12/Kaiser-Wilhelm-Tunnel2.jpg
https://imm-bochum.de/wp-content/uploads/2024/12/Kein-Titel-1920-x-1440-px-2.jpg
https://imm-bochum.de/wp-content/uploads/2024/12/KWT-TVM.jpg
https://imm-bochum.de/wp-content/uploads/2024/12/KWT_IMG_0716-2.jpg
https://imm-bochum.de/wp-content/uploads/2024/12/Neuer-Kaiser-Wilhelm-Tunnel.jpg

NEW KAISER-WILHELM-TUNNEL

Title:

Description:

  • Project location: Cochem, Germany
  • Client: DB ProjektBau GmbH, Frankfurt, Federal Railway Authority, Frankfurt / Saarbrücken
  • Processing time: 2009 - 2014
  • Type: Single-track railroad tunnel
  • Length: 4242 m
  • Diameter: 10,00 m
  • Overlap: between approx. 5 m and approx. 255 m
  • Machine type: EPB shield (open/closed mode)

Areas of responsibility

  • EBA test engineer Structural inspection of the implementation documents
  • Experts for TVM
  • Expert services during construction in conjunction with the technical preservation of evidence for the Sign drive
  • Process controlling for shield tunnelling
Business hours

Contact us

You can contact us here.

+49 (0)234 / 9 70 77-0Business hours: Monday to Friday, 08:00 - 17:00

Locations

Bochum & Munich



Head office Bochum
Konrad-Zuse-Strasse 18
44801 Bochum

+49 (0)234 / 9 70 77-0info@imm-bochum.de

Munich branch
Nymphenburger Str. 20a
80335 Munich

+49 (0)89 / 890 65 98-20info@imm-muenchen.de

Social Media

IMM also on LinkedIn

Take a look at LinkedIn to make sure you don't miss anything.


en_USEN