- Project location: New Erfurt - Leipzig/Halle line, Germany
- Client: Federal Railway Authority, Halle,
DB ProjektBau GmbH, Leipzig - Processing time: 1995 - 2011
- Type: Single-track railroad tunnel (mixed traffic),
2 tubes - Length: 2 x 6970 m
- Diameter: 10,87 m
- Overlap: between approx. 3 m and approx. 65 m
- Machine type: Hydroshield (open/closed mode)
Areas of responsibility
- Participation in the planning of the construction process, the Shield drive and the Segment lining
- Participation in the preparation of the tender documentsdocuments
- Advice on awarding contracts
- EBA test engineer Structural inspection of the implementation documents
- Process controlling for shield tunnelling
- Tunnel construction/ construction process engineering Advice on shield tunnelling and the shield machine