Project location: Koraple, Styria - Carinthia, Austria
-
Client: ÖBB-Infrastruktur Bau AG, Austria
-
Type: Single-track monorail tunnel (mixed traffic),
2 tubes -
Building volume: 350 million (IMM planning area)
-
Length: approx. 2 x 32.8 km
-
Diameter: DN 9.90 m, segment 9.50 m
-
Overlap: between approx. 5 m and 1250 m
-
Machine type: EPB shield (open/closed-mode) convertible to hard stone
- Processing time: 2006 - 2022 (construction lot KAT 3)
Areas of responsibility
Shield tunnelling Carinthia, L = 11.16 km (KAT 3) Mitterpichling open construction method (OBW Mi):
- Planning of the construction method, the shield run and segment lining / inner shell for the shield section
- Advice on awarding contracts
- Tender planning for the tunnel structures (machine excavation and OBW Mi), corresponds to: HOAI object planning Lph: 1, 2, 3, 4 and 6, 7 HOAI / structural planning Lph: 2, 3, 4, 5 and 6
- Execution planning for the tunnel structures (machine excavation and OBW Mi), corresponds to: HOAI object planning Lph: 5, HOAI structural planning Lph: 4, 5
- Construction supervision Mechanical engineering consulting
- Process controlling
- Geotechnical construction supervision for shield driving