Brenner Base Tunnel main construction lot Sillschlucht - Pfons - H 41

https://imm-bochum.de/wp-content/uploads/2024/12/01-Brenner-Basistunnel-1.jpg
https://imm-bochum.de/wp-content/uploads/2024/12/Kein-Titel-1920-x-1440-px.jpg

Brenner Base Tunnel main construction lot Sillschlucht - Pfons - H 41

Title:

Description:

Brenner Base Tunnel

  • Project location: Innsbruck (A)
  • Client: BRENNER BASISTUNNEL BBT SE Innsbruck (A)
  • Processing time: 2023 - dato
  • Utilization: 2 single-track railroad tunnels,
    leading pilot tunnel
  • Length: TBM: 8,100 or 8,400 m
  • Diameter: Diameter 10.37 m
  • Overlap: up to approx. 1,000 m
  • Machine type: EPB (open/closed mode)

Areas of responsibility

  • Tunnel construction consulting for the construction phase of the Continuous tunnelling Sillschlucht - Pfons
  • Project duration: planned until 2025

 

Business hours

Contact us

You can contact us here.

+49 (0)234 / 9 70 77-0Business hours: Monday to Friday, 08:00 - 17:00

Locations

Bochum & Munich



Head office Bochum
Konrad-Zuse-Strasse 18
44801 Bochum

+49 (0)234 / 9 70 77-0info@imm-bochum.de

Munich branch
Nymphenburger Str. 20a
80335 Munich

+49 (0)89 / 890 65 98-20info@imm-muenchen.de

Social Media

IMM also on LinkedIn

Take a look at LinkedIn to make sure you don't miss anything.


en_USEN