https://imm-bochum.de/wp-content/uploads/2024/12/Finnetunnel_AufbauDSC00196-2.jpg
https://imm-bochum.de/wp-content/uploads/2024/12/FinnetunnelOstportal1-2.jpg
https://imm-bochum.de/wp-content/uploads/2024/12/FinnetunnelOstportal3-2.jpg
https://imm-bochum.de/wp-content/uploads/2024/12/Finnetunnel-2.jpg
https://imm-bochum.de/wp-content/uploads/2024/12/Finnetunnel-3.jpg
https://imm-bochum.de/wp-content/uploads/2024/12/Finnetunnel_Aufbau_DSC00195-2.jpg

FINNETUNNEL

Title:

Description:

Finne tunnel

  • Project location: New Erfurt - Leipzig/Halle line, Germany
  • Client: Federal Railway Authority, Halle,
    DB ProjektBau GmbH, Leipzig
  • Processing time: 1995 - 2011
  • Type: Single-track railroad tunnel (mixed traffic),
    2 tubes
  • Length: 2 x 6970 m
  • Diameter: 10,87 m
  • Overlap: between approx. 3 m and approx. 65 m
  • Machine type: Hydroshield (open/closed mode)

Areas of responsibility

  • Participation in the planning of the construction process, the Shield drive and the Segment lining
  • Participation in the preparation of the tender documentsdocuments
  • Advice on awarding contracts
  • EBA test engineer Structural inspection of the implementation documents
  • Process controlling for shield tunnelling
  • Tunnel construction/ construction process engineering Advice on shield tunnelling and the shield machine
Business hours

Contact us

You can contact us here.

+49 (0)234 / 9 70 77-0Business hours: Monday to Friday, 08:00 - 17:00

Locations

Bochum & Munich



Head office Bochum
Konrad-Zuse-Strasse 18
44801 Bochum

+49 (0)234 / 9 70 77-0info@imm-bochum.de

Munich branch
Nymphenburger Str. 20a
80335 Munich

+49 (0)89 / 890 65 98-20info@imm-muenchen.de

Social Media

IMM also on LinkedIn

Take a look at LinkedIn to make sure you don't miss anything.


en_USEN