Shotcrete construction

Rothenstein_Zuschnitt1
Rothenstein1

  • Project location: Rothenstein
  • Client: Thuringian State Office for Construction and Traffic, Road Construction
  • Processing time: 2018 – 2021
  • Type: Road tunnel two tubes with 2 lanes
  • Length: 346 m mined construction method
    16 m in open construction
    34 m in semi-open construction
  • Diameter: 9,5 m
  • Overlap: 30 m

Areas of responsibility

  • Structural inspection of the tunnel structure, precuts, retaining walls north portal, operations building, pollutant basin, permanent anchors and reinforced concrete re-storage south portal


Kohlbergtunnel-e1739813742736.jpg

  • Project location: Pirna, Germany
  • Client: DEGES
  • Processing time: 2018 - dato
  • Type: single-tube road tunnel
  • Utilization: Oncoming traffic
  • Diameter: Jaw profile largest clear width 14.70 m
  • Length: 340 m, of which 300 m are mined
  • Overlap: approx. 30 m
  • Machine type: Excavator drive double-headed elm tunnel drive

Areas of responsibility

  • Review of the design documents

  • Review of the tender planning

  • Tunnel construction consulting and control for Tunneling and concreting work during and in the Follow-up to the drive

  • Participation in the determination of Tunneling classes, excavation and Safety measures

  • Assessment of the rock mass, evaluation of the Deformation measurements and checking the found rock properties with regard to the effects on the propulsion and the Inner shell

  • EPLASS plan management system, checking the Implementation planning and concepts from from a tunnel construction point of view.


München-Marienhof
München-Marienhof2
München-Marienhof3
München-Marienhof4

  • Project location: Munich, Germany
  • Client: DB InfraGO AG
  • Processing time: 2019 - dato
  • Type: Station in cover design,Platform area and transition to the U3/U6 in mining construction method
  • Excavation depth: approx. 40 m

Areas of responsibility

  • BVB services


BibratunnelWest_BlickzuFinnetunnel-2-1280x960.jpg

  • Project location: New Erfurt - Leipzig/Halle line, Germany
  • Client: Federal Railway Authority, Halle,
    DB ProjektBau GmbH, Leipzig
  • Processing time: 1995 - 2012
  • Type: Single-track railroad tunnel, 2 tubes, mixed traffic
  • Length: 2 x 6,466 m
  • Diameter: 9,60 m
  • Overlap: between approx. 15 m and approx. 50 m
  • Building process: Shotcrete construction

Areas of responsibility

  • Participation in the planning of the construction process
  • Participation in the preparation of the tender documentsdocuments
  • Advice on awarding contracts
  • Tunnel construction expert
  • Technical advice on tunnel construction Questions
  • External realization manager of the AG


STeinbühl3-IS-SW-Gewölbeschalwagen 4-2
STeinbühl3-VT-N-O-VBW03 20-2
Boßlertunnel2
STeinbühl3-IS-SW-Bewehrungswagen 2-2
STeinbühl3-IS-SO 7-2
STeinbühl3-IS-SW 3-2
STeinbühl3-VT-N-O-VBW03 16-2
STeinbühl3-IS-SW-Portalblock 387 1-2

  • Project location: Hohenstadt, Germany
  • Client: DB Stuttgart-Ulm GmbH project
  • Processing time: 2012 - 2019
  • Utilization: Single-track railroad tunnel
  • Length: 4,852 m (east tube) | 4,846 m (west tube)
  • Overlap: between approx. 15 m and approx. 130 m
  • GWU: approx. € 223 million in total

Areas of responsibility

  • Authorized person for building documents (BVB)
  • Engineering support for the client
  • Stability verification of the inner shell for the Fire - "second opinion"


Business hours

Contact us

You can contact us here.

+49 (0)234 / 9 70 77-0Business hours: Monday to Friday, 08:00 - 17:00

Locations

Bochum & Munich



Head office Bochum
Konrad-Zuse-Strasse 18
44801 Bochum

+49 (0)234 / 9 70 77-0info@imm-bochum.de

Munich branch
Nymphenburger Str. 20a
80335 Munich

+49 (0)89 / 890 65 98-20info@imm-muenchen.de

Social Media

IMM also on LinkedIn

Take a look at LinkedIn to make sure you don't miss anything.


en_USEN