  • Project location: New Erfurt - Leipzig/Halle line, Germany
  • Client: Federal Railway Authority, Halle,
    DB ProjektBau GmbH, Leipzig
  • Processing time: 1995 - 2011
  • Type: Single-track railroad tunnel (mixed traffic),
    2 tubes
  • Length: 2 x 6970 m
  • Diameter: 10,87 m
  • Overlap: between approx. 3 m and approx. 65 m
  • Machine type: Hydroshield (open/closed mode)

Areas of responsibility

  • Participation in the planning of the construction process, the Shield drive and the Segment lining
  • Participation in the preparation of the tender documentsdocuments
  • Advice on awarding contracts
  • EBA test engineer Structural inspection of the implementation documents
  • Process controlling for shield tunnelling
  • Tunnel construction/ construction process engineering Advice on shield tunnelling and the shield machine


Filder Durchschlag 4_003
Kein Titel (1920 x 1440 px)
Filder Durchschlag 4_005
Fildertunnel
IMG_4341
IMG_4349
IMG_4351
IMG_5785
IMG_5788

  • Project location: Stuttgart, Germany
  • Client: DB Projekt Stuttgart-Ulm GmbH, Stuttgart, Federal Railway Authority, Stuttgart
  • Processing time: 2011 - to date
  • Utilization: Single-track railroad tunnel
  • Length: TVM: 2 x 4,035m + 2 x 3,620m | SBW: 2 x 1,150m
  • Diameter: 10,82 m
  • Overlap: between approx. 6 m and approx. 220 m
  • Machine type: EPB (open/closed mode)

Areas of responsibility

  • EBA test engineer (Structural inspection of the implementation documents)
  • TVM consultant (Tunnel construction consulting for shield-specific questions)


01 Brenner Basistunnel
Kein Titel (1920 x 1440 px)

  • Project location: Innsbruck (A)
  • Client: BRENNER BASISTUNNEL BBT SE Innsbruck (A)
  • Processing time: 2023 - dato
  • Utilization: 2 single-track railroad tunnels,
    leading pilot tunnel
  • Length: TBM: 8,100 or 8,400 m
  • Diameter: Diameter 10.37 m
  • Overlap: up to approx. 1,000 m
  • Machine type: EPB (open/closed mode)

Areas of responsibility

  • Tunnel construction consulting for the construction phase of the Continuous tunnelling Sillschlucht - Pfons
  • Project duration: planned until 2025

 


Boßlertunnel3
BOßLER-TVM 7-2
20141014_Baustelleneinrichtung_Portal_Aichelberg_D810-1391
BOßLER1-O-TVM 6-2
Boßler-2
BOßLER-O-1Rauchschott 18-2
BOßLER-O-2Rauchschott 14-2

  • Project location:  Aichelberg, Germany
  • Client: DB Stuttgart-Ulm GmbH project
  • Processing time: 2012 - dato
  • Utilization: single-track railroad tunnel
  • Length: 8,821 m (east tube) | 8,806 m (west tube)
  • Diameter: 11,39 m
  • Overlap: between approx. 30 m and approx. 280 m
  • Machine type: EPB (open-/closed-mode)
  • GWU: approx. € 417 million in total

Areas of responsibility

  • Authorized person for building documents (BVB)
  • Evidence analysis TVM (process controlling)


Business hours

Contact us

You can contact us here.

+49 (0)234 / 9 70 77-0Business hours: Monday to Friday, 08:00 - 17:00

Locations

Bochum & Munich



Head office Bochum
Konrad-Zuse-Strasse 18
44801 Bochum

+49 (0)234 / 9 70 77-0info@imm-bochum.de

Munich branch
Nymphenburger Str. 20a
80335 Munich

+49 (0)89 / 890 65 98-20info@imm-muenchen.de

Social Media

IMM also on LinkedIn

Take a look at LinkedIn to make sure you don't miss anything.


en_USEN