  • ​Project location: Henstedt-Ulzburg, Germany ​
  • Client: TenneT TSO GmbH, Bayreuth
  • Processing time: 2019 - dato
  • Utilization: 380 kV underground cable routeEast Coast pipeline to connect Offshore wind turbines
  • Length: 2 x 965 m​
  • Diameter: Diameter 2.6 m ​
  • Overlap: up to approx. 10 m ​
  • Machine type: Hydroshield / Slurry shield​

Areas of responsibility​

  • Tender planning​
  • Invitation to tender​
  • Participation in the awarding of contracts​
  • Construction supervision and tunnel construction Advice for the construction phase of the continuous Drives​
  • Project duration pipe jacking: July to October 2024​


Kein Titel (1920 x 1440 px)
50hz Startschacht_112022

  • Project location: Berlin, Germany​
  • Client: 50Hertz Transmission GmbH Berlin​
  • Processing time: 2015 - dato​
  • Utilization: Cable tunnel​
  • Length: 6,700 m, 1 tube​
  • Diameter: 3.0 m / 3.6 m (inside/outside)​
  • Overlapapprox. 25 m to 30 m​
  • Machine type: TVM - Hydro shield​
  • Building volume: 53 million​

​

Areas of responsibility ​

  • HOAI object planning of engineering structures: Lph. 1 - 7​
  • HOAI structural design of civil engineering structures: Lph. 3​
  • Technical equipment of the shaft structures​
  • Safety and health protection​
  • Preparation of the tender documents​
  • Participation in awarding​
  • TBM consultant​
  • Process controlling​


Bild-Innovation-1280x960.jpg

  • Project location: Ibbenbüren, Germany​
  • Client: RAG Anthrazit Ibbenbüren GmbH​
  • Processing time: 2018 - dato​
  • Type: Mine water channel​
  • Utilization: Tunnel for mine water​
  • Length: approx. 7.2 km​
  • Diameter: 3,60 m inside​
  • Overlap: approx. 7 m to max. 95 m​
  • Machine type: EPB / Hydro​

Areas of responsibility​

  • Planning, site management and local construction supervision Rescue concept​
  • Project planning shield tunnel, Lph. 3 - 4, 5 - 8​
  • Structural design of the shield tunnel, Lph. 1 - 3, 4 - 6 ​
  • TBM consultant​
  • Process controlling​


Hanau Maschine mit Logo_012024
Hanau Rohrstrang fertig_022024
Hanau Rohrvortrieb_Einhebung Maschine_012024
Hanau Startschacht_022024
IMG-20240123-WA0015
IMG-20240123-WA0016

  • Project location: Hanau, Germany​
  • Client: Hanau Netz GmbH, Hanau /Engineering office Becker & Partner GmbH, Bad Soden-Salmünster​
  • Processing time: 2021 - 2024​
  • Utilization: 20 kV power line, Establishment of a data center
  • Length: approx. 240 m​
  • Diameter: Diameter 1.96 m​
  • Overlap: up to approx. 6.0 m ​
  • Machine type: Hydro shield​

Areas of responsibility​

  • Engineering support​
  • Support pressure calculations​
  • Creation UiG​
  • Process controlling during the tunnelling work​
  • BVB services according to VV-Bau​


Business hours

Contact us

You can contact us here.

+49 (0)234 / 9 70 77-0Business hours: Monday to Friday, 08:00 - 17:00

Locations

Bochum & Munich



Head office Bochum
Konrad-Zuse-Strasse 18
44801 Bochum

+49 (0)234 / 9 70 77-0info@imm-bochum.de

Munich branch
Nymphenburger Str. 20a
80335 Munich

+49 (0)89 / 890 65 98-20info@imm-muenchen.de

Social Media

IMM also on LinkedIn

Take a look at LinkedIn to make sure you don't miss anything.


en_USEN