Portfolio Archive - IMM Maidl & Maidl - Consulting Engineers

IMG_20160818_112649-1280x720.jpg

  • Project location: Freiburg, Germany
  • Client: Freiburg Regional Council
  • Processing time: 2016 - dato

  • Type: single-tube Road tunnel in the Two-way traffic (RQ 11t)
  • Length: 844 m
  • Overlap: max. approx. 40 m
  • Breakdown bays: 2

Areas of responsibility

  • § 43 HOAI OP Lph. 1-3
  • § 51 HOAI TP Lph. 2-3
  • Preparation of geotechnical / tunnel constructionReport


Rüßdorf1
Rüßdorf2
Rüßdorf3
Rüßdorf4

  • Project location: Leipzig, Lehna mill
  • Client: DB InfraGO AG Erfurt, EBA Hall
  • Processing time: 2024
  • Utilization: Partial renewal of tunnel Rüßdorf
  • Length: 264 m
  • Diameter: single-track existing tunnel to EBO

Areas of responsibility

  • Static-constructive testing
  • Checking the implementation planning
  • Project duration: planned until 2025


Kein-Titel-1920-x-1440-px-4-1280x960.jpg

  • Project location: Dresden, Germany
  • Client: Landesbetrieb für Straßenbau und Traffic Dresden
  • Processing time: 2016 - dato
  • Type: twin-tube road tunnel
  • Length: approx. 3.3 km

Areas of responsibility

  • § 43 HOAI OP Lph. 1-3, 5, 6 (structural retrofitting)
  • § 51 HOAI TP Lph. 2-6 (structural retrofitting)


Bürgerwald1
Bürgerwald2
Bürgerwald3
Kein Titel (1920 x 1440 px)

  • Project location: Waldshut - Tiengen and Lauchringen
  • Client: The Autobahn GmbH of the Federal Government,
    Southwest branch Stuttgart
  • Processing time: 2024 - dato
  • Type:
    • BWT - 2-strip vault cross-section,including two rescue tunnels
    • HÄT- 3-lane frame structure
  • Length:
    • BWT - 1,462 m
    • HÄT - 150 m

Areas of responsibility

  • Planning services for the concrete and Joint renovation of tunnel structures
    according to ZTV-ING
  • Project planning HOAI, phases 1-3, 5 and 6
  • Structural design HOAI, 2-3 and 6


IMG_2916
OKL_20240702-DB-_MG_0372-1
20240702-DB-_MG_0018-1-min
IMG_2915

  • Project location: Henstedt-Ulzburg, Germany
  • Client: TenneT TSO GmbH, Bayreuth
  • Processing time: 2019 - dato
  • Utilization: 380 kV underground cable routeEast Coast pipeline to connect Offshore wind turbines
  • Length: 2 x 965 m
  • Diameter: Diameter 2.6 m
  • Overlap: up to approx. 10 m
  • Machine type: Hydroshield / Slurry shield

Areas of responsibility

  • Tender planning
  • Invitation to tender
  • Participation in the awarding of contracts
  • Construction supervision and tunnel construction Advice for the construction phase of the continuous Drives
  • Project duration pipe jacking: July to October 2024


Kein Titel (1920 x 1440 px)
50hz Startschacht_112022

  • Project location: Berlin, Germany
  • Client: 50Hertz Transmission GmbH Berlin
  • Processing time: 2015 - dato
  • Utilization: Cable tunnel
  • Length: 6,700 m, 1 tube
  • Diameter: 3.0 m / 3.6 m (inside/outside)
  • Overlapapprox. 25 m to 30 m
  • Machine type: TVM - Hydro shield
  • Building volume: 53 million

Areas of responsibility

  • HOAI object planning of engineering structures: Lph. 1 - 7
  • HOAI structural design of civil engineering structures: Lph. 3
  • Technical equipment of the shaft structures
  • Safety and health protection
  • Preparation of the tender documents
  • Participation in awarding
  • TBM consultant
  • Process controlling


Bild-Innovation-1280x960.jpg

  • Project location: Ibbenbüren, Germany
  • Client: RAG Anthrazit Ibbenbüren GmbH
  • Processing time: 2018 - dato
  • Type: Mine water channel
  • Utilization: Tunnel for mine water
  • Length: approx. 7.2 km
  • Diameter: 3,60 m inside
  • Overlap: approx. 7 m to max. 95 m
  • Machine type: EPB / Hydro

Areas of responsibility

  • Planning, site management and local construction supervision Rescue concept
  • Project planning shield tunnel, Lph. 3 - 4, 5 - 8
  • Structural design of the shield tunnel, Lph. 1 – 3, 4 – 6
  • TBM consultant
  • Process controlling


Hanau Maschine mit Logo_012024
Hanau Rohrstrang fertig_022024
Hanau Rohrvortrieb_Einhebung Maschine_012024
Hanau Startschacht_022024
IMG-20240123-WA0015
IMG-20240123-WA0016

  • Project location: Hanau, Germany
  • Client: Hanau Netz GmbH, Hanau /Engineering office Becker & Partner GmbH, Bad Soden-Salmünster
  • Processing time: 2021 – 2024
  • Utilization: 20 kV power line, Establishment of a data center
  • Length: approx. 240 m
  • Diameter: Diameter 1.96 m
  • Overlap: up to approx. 6.0 m
  • Machine type: Hydro shield

Areas of responsibility

  • Engineering support
  • Support pressure calculations
  • Creation UiG
  • Process controlling during the tunnelling work
  • BVB services according to VV-Bau


Rothenstein_Zuschnitt1
Rothenstein1

  • Project location: Rothenstein
  • Client: Thuringian State Office for Construction and Traffic, Road Construction
  • Processing time: 2018 – 2021
  • Type: Road tunnel two tubes with 2 lanes
  • Length: 346 m mined construction method
    16 m in open construction
    34 m in semi-open construction
  • Diameter: 9,5 m
  • Overlap: 30 m

Areas of responsibility

  • Structural inspection of the tunnel structure, precuts, retaining walls north portal, operations building, pollutant basin, permanent anchors and reinforced concrete re-storage south portal


Kohlbergtunnel-e1739813742736.jpg

  • Project location: Pirna, Germany
  • Client: DEGES
  • Processing time: 2018 - dato
  • Type: single-tube road tunnel
  • Utilization: Oncoming traffic
  • Diameter: Jaw profile largest clear width 14.70 m
  • Length: 340 m, of which 300 m are mined
  • Overlap: approx. 30 m
  • Machine type: Excavator drive double-headed elm tunnel drive

Areas of responsibility

  • Review of the design documents

  • Review of the tender planning

  • Tunnel construction consulting and control for Tunneling and concreting work during and in the Follow-up to the drive

  • Participation in the determination of Tunneling classes, excavation and Safety measures

  • Assessment of the rock mass, evaluation of the Deformation measurements and checking the found rock properties with regard to the effects on the propulsion and the Inner shell

  • EPLASS plan management system, checking the Implementation planning and concepts from from a tunnel construction point of view.


Business hours

Contact us

You can contact us here.

+49 (0)234 / 9 70 77-0Business hours: Monday to Friday, 08:00 - 17:00

Locations

Bochum & Munich



Head office Bochum
Konrad-Zuse-Strasse 18
44801 Bochum

+49 (0)234 / 9 70 77-0info@imm-bochum.de

Munich branch